VAUGHAN
Home Renovations and Custom Builds in Vaughan
Fireplaces, basements, kitchens and open-concept living, with the local permit basics.
Maple Custom Homes is a general contractor that builds custom homes and handles renovations, basements, painting and drywall across the Greater Toronto Area, including Vaughan. You work with one team and one point of contact from the first call to the final walkthrough. This page covers our Vaughan projects and what the City of Vaughan says about permits and zoning, so you know what to expect before a renovation or build starts.
Projects in Vaughan
From our project gallery.

Diamond Tile Fireplace
A custom tall fireplace finished with a diamond-tile surround.

Full-Height Fireplace
A full-height fireplace in a diamond-pattern tile.

Open Concept Living
An open-concept living space built around a fireplace.
Fireplaces and feature walls
Fireplaces are the most visible thing in our Vaughan gallery projects. A tall fireplace with a diamond-tile surround, a full-height fireplace in a diamond pattern and an open living space built around a fireplace all combine tile, framing, drywall and paint. If a feature wall is part of your plan, the same team can also handle the surrounding kitchen or basement work.
Building permits in Vaughan
According to the City of Vaughan, a building permit is required for a new house, for an addition or alteration to a home, and for structural alterations inside residential buildings. Applications go through the City's online permitting portal. The City asks for fully dimensioned drawings supplied as a PDF, prepared by a qualified designer who holds a Building Code Identification Number (BCIN). Owners may prepare their own drawings if they meet the City's stated requirements.
We manage permit applications and municipal approvals as part of our service, so you do not need to deal with the city directly.
Finishing a basement in Vaughan
The City's page on finishing a basement says a permit is needed for the finishing itself and for any new plumbing fixtures or relocated ones. It also notes that a secondary suite needs a separate permit. The City's secondary suite guide adds that each additional unit needs one more parking space on a surfaced driveway, garage or carport, and that secondary suites are not allowed in a floodplain or in the Woodbridge Special Policy Area. If your basement plan includes a rental unit, read that guide before the design is final.
Zoning comes first
As of October 2026, the City states that its Comprehensive Zoning By-law 001-2021 is under appeal to the Ontario Land Tribunal. Zoning By-law 1-88 therefore stays in effect, and applications that are not transitioned must comply with both by-laws while the appeal continues. The City says zoning should be confirmed before you apply for a permit, and that work which needs no permit must still comply. When a design does not meet the by-law, the Committee of Adjustment hears minor variance applications under the Planning Act. We raise these questions in the first consultation, before the drawings are fixed.
How a Vaughan project works
You start with a free consultation covering your vision, goals and budget. We prepare a detailed scope, timeline and transparent quote, build with weekly updates, and finish with a walkthrough and punch list.
Official guides
Ontario has one Building Code, and each city adds its own zoning by-law and publishes its own homeowner guides. These links go to the official pages. They open in a new tab, and the owners of those pages keep them current.
- Ontario Building Code (O. Reg. 163/24)(opens in a new tab)
The one provincial Building Code that every Ontario city enforces. It replaced O. Reg. 332/12 on January 1, 2025.
- Vaughan zoning services(opens in a new tab)
Explains how the City checks zoning, which by-laws apply right now, and where to find the zoning maps.
- Building permits for homes: new houses and additions(opens in a new tab)
Lists the drawings and forms Vaughan wants for a new house or an addition.
- Finishing a basement(opens in a new tab)
Says when a basement finish needs a permit, including the plumbing triggers.
- How to get a secondary suite(opens in a new tab)
Walks through parking, where suites are not allowed and how older and newer suites are treated.
- Committee of Adjustment(opens in a new tab)
Covers minor variance and consent applications when a design does not meet the zoning by-law.
Services we offer in Vaughan
Frequently asked questions
What Vaughan projects has Maple Custom Homes completed?
+
Do I need a building permit to finish a basement in Vaughan?
+
How do I get a free estimate in Vaughan?
+
Also see our work in Mississauga, Barrie, Brampton, Oakville and Richmond Hill.
Get a free estimate in Vaughan
Call (647) 960-4017 or email info@maplecustomhomes.ca. Monday to Friday 8am to 6pm, Saturday 9am to 2pm.