MISSISSAUGA
Renovations and General Contracting in Mississauga
Finish carpentry, kitchens and basements, with the City of Mississauga permit steps.
Maple Custom Homes is a general contractor handling renovations, kitchens, basements, painting, drywall and custom builds across the Greater Toronto Area, including Mississauga, with one team and one point of contact. This page covers our Mississauga projects and the steps the City of Mississauga lays out before a building permit application, so you can plan the approvals alongside the design.
Projects in Mississauga
From our project gallery.

Paneled Media Wall
A fireplace with wall paneling and a mounted TV.

Wainscoting Detail
A fireplace detail with wainscoting and natural light.
Finish carpentry and wall detail
Paneling, wainscoting and mounted media walls are finish-carpentry jobs where drywall, trim and paint have to line up. Both Mississauga gallery projects show that kind of work, and the same attention to finish applies whether the job is a feature wall, a full kitchen renovation or a basement. Homeowners often start with painting and drywall or a kitchen and add more later.
Before a building permit application
The City of Mississauga takes all building permit applications online through its ePlans portal, and its own checklist for applicants has five steps: confirm that the project needs a permit, check the zoning of the property, understand the cost and the time frames, gather the forms and drawings, and find out whether other approvals are needed. The City strongly recommends working with an architect, professional engineer or qualified designer so the drawings comply with the Building Code and the Mississauga Zoning By-law.
We manage permit applications and municipal approvals as part of our service, so you do not need to deal with the city directly.
Other approvals the City lists
Depending on the project and the property, the City says you may also need approval from a conservation authority (it names Credit Valley Conservation, Conservation Halton and the Toronto and Region Conservation Authority) when the land is regulated, heritage approval for listed or designated properties, Ministry of Transportation approval inside controlled areas, site plan approval, a tree removal permit, or Committee of Adjustment approval for changes that do not meet the zoning by-law. Applicants complete an Applicable Law Form to flag which of these apply.
The City also publishes a page on building permit cost and time frames and a fee schedule, which are worth reading before you set a project date.
Committee of Adjustment and second units
Mississauga's Committee of Adjustment is seven citizen members appointed by Council. It considers minor variance and consent applications, and owners within 60 metres of the property receive notice. On second units, the City says a basement apartment or in-law suite must meet the Ontario Building Code, the Ontario Fire Code and the Zoning By-law, and must be registered with the City under its Second Units Registration By-law. If a basement project includes a rental unit, plan for that registration from the start.
How a Mississauga project works
You start with a free consultation about your goals and budget. We prepare a detailed scope, timeline and transparent quote, build with weekly updates, and finish with a final walkthrough and punch list.
Official guides
Ontario has one Building Code, and each city adds its own zoning by-law and publishes its own homeowner guides. These links go to the official pages. They open in a new tab, and the owners of those pages keep them current.
- Ontario Building Code (O. Reg. 163/24)(opens in a new tab)
The one provincial Building Code that every Ontario city enforces. It replaced O. Reg. 332/12 on January 1, 2025.
- Zoning information(opens in a new tab)
Gathers the zoning by-law, the property zoning search, the zoning map and the preliminary zoning review.
- Building permit application process(opens in a new tab)
The City's five steps to check before applying, and the online ePlans process.
- Drawings and documents you need(opens in a new tab)
Explains which drawings and forms go with each type of project.
- Committee of Adjustment(opens in a new tab)
How minor variance and consent applications are heard.
- Registering a second unit(opens in a new tab)
What a second unit must meet and how to register one.
Services we offer in Mississauga
Frequently asked questions
What kind of work has Maple Custom Homes done in Mississauga?
+
Does the City of Mississauga require a building permit application to be online?
+
Can you work on commercial spaces in Mississauga?
+
Also see our work in Vaughan, Barrie, Brampton, Oakville and Richmond Hill.
Get a free estimate in Mississauga
Call (647) 960-4017 or email info@maplecustomhomes.ca. Monday to Friday 8am to 6pm, Saturday 9am to 2pm.